Bridge Approach Work
Anchorage, Alaska. Approaches, retaining, and pavement that have to take load in freeze and thaw.
InnovateDiscoverCollaborateTransform
The approaches, the retaining, and the pavement had to take load in freeze and thaw, right up to the bridge. A weak approach makes a sound bridge feel broken.
Traffic kept crossing while we rebuilt the section. The new work was built to carry the same load the bridge already carries, in every season.
- Square feet
- 96,000
- Scope
- Approaches and retaining
- Location
- Anchorage, Alaska
- Load
- Freeze and thaw







